Commercial, residential and infrastructure construction across Ontario
HARBORLINESTERLINGCONSTRUCTION INC. Request a Proposal
Infrastructure and Public Works

Sidewalks, Curbs and Accessible Crossings

Safe, accessible walking routes, built to the AODA Design of Public Spaces Standards.

Overview

Sidewalks, Curbs and Accessible Crossings in Toronto and across Ontario

Sidewalks and curbs are used by everyone, every day, in every season. They need to drain, resist salt and frost, and give people who use wheelchairs, walkers, strollers and white canes a safe, predictable route.

We build and replace concrete sidewalks, curb and gutter, curb ramps and depressed curbs with tactile walking surface indicators, multi-use paths and boulevard restoration. Work meets the owner's specifications and the AODA Design of Public Spaces Standards where they apply, with pedestrian detours maintained throughout.

Harborline Sterling Construction Inc. is principal-led. One of our co-founders, Mansoor Alam Khan or Maqsood Mohammed, oversees every project, so decisions get made quickly and you always know who is accountable.

Scope

What sidewalks, curbs and accessible crossings includes

Every project is different, but these are the parts of the work we take responsibility for.

01

Sidewalk construction and replacement

Removal of damaged panels, base preparation, formed or slip-formed concrete, jointing and curing.

02

Curb and gutter

New and replacement curb and gutter, set to grade so water reaches the catch basins.

03

Curb ramps and tactile indicators

Curb ramps and depressed curbs with tactile walking surface indicators, built to the slopes and dimensions the standards require.

04

Multi-use paths and trails

Asphalt and concrete paths for walking and cycling, with grading, drainage and signage.

05

Boulevard restoration

Topsoil, sod, driveway aprons and interlock reinstated after construction, so streets look finished.

How it runs

How the work runs

The same disciplined backbone we use on every project, adapted for this kind of work.

Review

Scope or tender review, site walk and pedestrian detour plan.

Prepare

Submittals, locates, and traffic and pedestrian control plans.

Build

Removals, base, forming, concrete placement and finishing, with testing.

Restore

Boulevard restoration, clean-up and as-built records.

The Harborline Sterling difference

Why choose us for sidewalks and curbs

What municipalities, agencies and private owners can count on, on every contract.

01

Built to public standards

Work planned to Ontario Provincial Standards (OPSS and OPSD) and each owner's specifications, with testing and inspection built into the schedule.

02

Safe work zones

Traffic control to Ontario Traffic Manual Book 7, locates through Ontario Dig Authority before every dig, and site safety under the Occupational Health and Safety Act.

03

Accessible by design

Curb ramps, tactile walking surface indicators, paths, play spaces and parking built to the AODA Design of Public Spaces Standards where they apply.

More infrastructure services

Other ways we can help

Many projects combine services. Ask us how they fit together for yours.

Also from Harborline Sterling

Questions

Frequently asked questions

What are tactile walking surface indicators?

They are textured surfaces, usually raised domes, placed at curb ramps and similar edges so people who are blind or have low vision can detect where the walkway meets the road. The AODA Design of Public Spaces Standards require them at curb ramps and depressed curbs.

Who do the AODA Design of Public Spaces Standards apply to?

They apply to the Ontario government, public sector organizations and many private and non-profit organizations when they build new or redevelop public spaces such as exterior paths, parking, play spaces and trails. Requirements vary by organization type and size.

How do you keep pedestrians safe during sidewalk work?

We plan pedestrian detours and protected routes before starting, keep accessible routes open wherever possible, and follow Ontario Traffic Manual Book 7 for work next to traffic.

Do you build private sidewalks and walkways?

Yes. We build walkways, curbs and accessible routes for plazas, offices, schools, places of worship and condominiums.

How soon can a new sidewalk be used?

Pedestrians can usually use new sidewalks within days, but concrete keeps gaining strength for weeks. We protect it while it cures, especially in hot or cold weather.

Talk to us about your sidewalk project

Put one accountable team in charge: on schedule, on budget, with permits and inspections handled the whole way.

Get in touch

Start your project

Tell us what you are planning. We will set up a straightforward conversation about scope, budget and timeline, with no obligation.

Head officeToronto, Ontario
Service areaAll of Ontario

Request a proposal

Tell us a little about your project. It takes about a minute.

We use your details only to respond to your inquiry. See our privacy policy.

Call Get a quote